According to the requirements for establishing the railway construction standard system ofCHINA RAILWAY,this Specification is formulated on the basis of Technical Guide for Constructiono f Mixed Passenger and Freight Railway Signaling System(TZ 206-2007) and Technical Guide for Construction o f ZPW-2000 Track Circuit (Document JGBZ [2011] No. 86) by summarizingthe experience obtained in the construction,operation management and equipment maintenance ofChinese railway signaling projects9 learning from relevant research conclusions, and extensivelysoliciting opinions from construction and operation parties concernecL This Specification consists of 17 chapters:General Provisions9Terms and Abbreviations,BasicRequirement,Construction Preparation, Optical and Electrical Cables, Fixed Trackside Signal, Switching Equipment, Switch Snow-Melting Equipment, Track Circuit, Balise and Outdoor Line-side Electronic Unit (LEU) ,Indoor Equipment,Hump Signaling Equipment,lnstall
This Specificatiois one of CHINA RAILWAY standards iEnglish.The translatiois performed under-the organizatioof China Railway Economic and Planning Research Institute authorized by CHINA RAILWAY as per relevant procedures and regulations. This Specificatiois the official English language versioof Q]CR 9230-2016. The Chinese versioof this Specificatiowas issued by CHINA RAILWAY and came into effect oNovember l9 2016.1case of discrepancies betweethe two versions, the Chinese versioshall prevail. CHINA RAILWAY owns the copyright of this English version. China Academy of Railway Sciences prepared the English version. China Railway Engineering Consulting Group Co. Ltd. provided great support during review of this English version. Your ments are invited and should be addressed to China Railway Economic and Planning Research Institute,29B,Beifengwo Road,HaidiaDistrict,Beijing,100038,P. R. China. The translatiowas performed by CheMin,Tang Song,Zhang Yuchen The translatio
This Code is prepared on the basis of Code for Design of Water Supply and Sewerage of Railway (TB 102008) by summarizing the experience gained in the design, construction and operation of water supply and drainage works for railway project, incorporating relevant research achievements ,implementing national policies on resources conservation, energy conservation and environmental protection, and prehensively soliciting the opinions of relevant parties. Code for Design o f Wastewater Treatment o f Railway (TB 10079-2013) is incorporated into this Code according to the requirements of establishing a railway industry standard system This Code prises 17 chapters: General Provisions9 Terms, Basic Requirements, Water Supply Station and Domestic Water Supply Station (Point),Water Consumption, Water Quality and Water Pressure, Water Source9Water Supply Pumping Station, Water Supply and Distribution Pipe, Water Storage and Distribution Structure, Water Supply Plant
This standard stipulated the catalogue and coding, defect description, causes of defects,means of detectioand methods should be takeof various rail defects. This standard applies to the statistics of rail defects, Cause of defect and defect informatiotreatment. This standard doesn't apply to the following defects: a)The rail parts made from cutting and forging rails,such as switch rails(point rails,wing rails) ,guardrail,expansiojoint rails,etc.; b)Driving accidents caused by the non-rail defects or rails caused by the disaster; c)The few special rails made from the special experiment materials or with special cross sectioout of this standard.
《水环境质量与污染物排放标准汇编(第2版)》共汇集了截至2017年5月底我国正式发布实施且现行有效的水环境质量和污染物排放方面的标准和地方标准共计97项,其中标准68项,地方标准29项。68项标准涉及我国水环境质量标准、工业污染物排放标准、特定环境下的水质量标准等诸多方面。29项备案的水污染物排放地方标准涉及北京、上海、天津、山东等15个省、市、自治区。本版汇编与上一版相比,新增标准8项,删减作废标准5项。
This Standard is piled with a view to guiding the constructioand quality acceptance of railway natural disaster and foreigobject intrusiomonitoring system (hereafter referred to as "disaster monitoring system") and unifying relevant technical requirements. This Standard is applicable for the constructioand quality acceptance of the disaster monitoring system of railways to be constructed or reconstructed. The constructioand acceptance of the disaster monitoring system shall conform to relevant national and industry technical standards. The constructioshall be performed othe basis of desigdocuments, and the constructioquality shall meet the requirements of system functionality, safety and quality features specified ithis Standard. Standardized management concerning system construction, staffing9 site management and process controlling shall be strengthened during constructioof the disaster monitoring system. During constructioof the disaster monitoring system, proper constru
中国目前工程塑料的产量较低,大部分需要进口,这对中国工程塑料的开发和生产提出了严峻的挑战。加速工程塑料的发展,是从事工程塑料研制、生产、成型加工等人员所面临的重要任务。正是基于这种考虑,我们参照外有关资料并结合自己的工作实践,编写了这本手册,以期能对中国工程塑料的发展作些微薄的贡献。 全书共分三篇,即篇总论,第二篇通用工程塑料和第三篇特种工程塑料。篇介绍了工程塑料的发展简史、技术开发动向、性能特点及测试方法、成型加工和应用领域等;第二篇介绍ABS类树脂、聚酰胺、聚碳酸酯类树脂、聚甲醛和改性聚甲醛、聚苯醚和改性聚苯醚、热塑性聚酯,以及超高分子量聚乙烯等通用工程塑料品种;第三篇介绍聚砜类树脂、聚酰亚胺、聚苯硫醚和改性聚苯硫醚、聚芳酯和改性聚芳酯、聚苯酯和改性聚苯酯、聚芳醚酮、液晶
编写组在全面总结外近年来汽车试验场工程经验和科技成果的基础上,对外已建和在建汽车试验场进行了广泛调研,充分吸收了外相关标准规范的先进技术方法和建设经验,并广泛征集了行业内外的意见和建议,制订本规程。 本规程分为5章,主要内容包括总则、术语、设计、施工、施工质量检查与验收。 本规程基于通用的工程建设理论及原则编制,适用于本标准提出的应用条件。对于某些特定专项应用条件,使用本规程相关条文时,应对适用性及有效性进行验证。